NetLink integration with Genetec's Security Center provides full power system monitoring and control capabilities to Security Center. Power system alerts, parameter measurements, and system control features are all available directly from the Security Center interface, streamlining system maintenance and maximizing system uptime.
Integration to Security Center is via the LSPEntity software package. LSPEntity allows adding NetLink devices into Genetec's Security Center as an Entity. Before installing, a license must be obtained from Genetec under part number GSC-1SDK-LSP-NetLink.
Literature Downloads
Description | Latest Revision | Software File | Manuals | Release Notes |
LSPEntity Genetec Integration | 2.15 | Download | RN |
Requirements & Information
Item | Information |
Security Center Version Supported | 5.7, 5.8, 5.9, 5.10, 5.11 |
Genetec License Required | GSC-1SDK-LSP-NetLink |
NetLink Boards Supported | NL2, NL4, NLX |
NetLink Minimum Firmware Version | 9.18 or above |
Integration Type | SNMP Trap |
Integration Level | Full Integration |
Supported Alerts
Alert | Supported |
AC Fault Alert | ● |
System Fault Alert | ● |
Fire Alarm Active | ● |
Power Supply Service Due | ● |
Insufficient Battery Standby Time | ● |
Battery Replacement Due | ● |
M8 Output Voltage Out of Range | ● |
M8 Output Current Out of Range | ● |
Enclosure Temperature Out of Range | ● |
External Temperature (IDF Closet) Out of Range | ● |
Tamper Switch Alert | ● |
Device Detect (Connected or disconnected from NetLink) | ● |
Current Sensor Out of Range | ● |
Auxiliary Voltage Out of Range | ● |
Values Reported
Value | Supported |
AC Input Voltage | ● |
Power Supply Output Voltage | ● |
Power Supply Total Output Current | ● |
Battery Voltage | ● |
Battery Charge / Discharge Current | ● |
M8 Output (Lock) Voltage | ● |
M8 Output (Lock) Current | ● |
M8 Output (Lock) Cycle Count | ● |
Enclosure Temperature | ● |
External Temperature (IDF Closet) | ● |
Current Sensor Measurement | ● |
Auxiliary Voltage Measurement | ● |
Control Features
Control Item | Supported |
Start / Schedule Automated Battery Test | ● |
Power Cycle M8 Output | ● |
Power Cycle Power Supply Main Output | ● |
NetLink Control 1 / Control 2 Outputs | ● |
Sign up for emails related to Product news and updates.